Apartment S6 is for sale with a total usable area of 73.36 m², located on the 2nd floor of a modern residential building under construction. The living area of the apartment is 64.45 m², and the apartment has a spacious terrace of 15.46 m², partially covered, partially uncovered, and one outdoor paved parking space. The building consists of six residential units arranged over two floors and a business space on the ground floor, and all apartments in the building are for sale. Apartment layout Apartment S6 consists of an entrance, bathroom, two bedrooms, laundry room, kitchen with dining room, and living room with access to a spacious terrace that allows you to enjoy the outdoors and relax at any time of the day. Construction quality and equipment The building was designed with an emphasis on modern design, functionality and high energy efficiency: Thermal facade for superior energy efficiency Glass balcony railings with a modern and luxurious look ALU three-layer sliding balcony doors and windows for better sound and thermal insulation Sika and Mapei insulation systems Burglar and fire-resistant entrance doors Large format ceramics Own electricity and water meters Video intercom TV connections in every room and living room Preparation for a solid fuel stove WiFi inverter air conditioners - GREE or Midea in all bedrooms and living room Underfloor heating in bathrooms Electric water heater Top quality sanitary ware: Grohe / Hansgrohe / Voxort Electric blinds and mosquito nets on the windows Depending on the construction phase, customers can choose the ceramics and colors of the sanitary ware according to their own preferences. Location The apartment is located in a quiet and attractive area of Vodice, just 900 m from the Vrulje beach and 1,100 m from the city center. Vodice is a place that combines a Mediterranean atmosphere and a relaxed pace of life with a rich offer of activities, restaurants and cultural events, ideal for living and vacation. Each apartment has a paved parking space, with the possibility of purchasing an additional parking space. The planned completion of the works is scheduled for the summer of 2027. Note: Renders were used in the ad. For additional information and to arrange a viewing, please contact us.